A new kiln, dryer or HAG usually involves several parties: a fabricator for the steelwork, a refractory supplier, a lining contractor, an electrical contractor for controls and someone to commission it. Each hand-over is a place where time and money leak.
Where split contracts go wrong
- The lining design does not match the shell, anchors or nozzles
- Equipment arrives before the refractory, or the other way round
- Nobody owns the dry-out and first heat-up
- Startup problems turn into disputes about who is responsible
- Small changes need approval from three parties
What one party changes
When the same party designs the equipment, supplies the refractory, erects it and commissions it, the hand-overs happen inside one team. The shell is built with the lining in mind, materials arrive when they are needed, and one person answers for the result at startup.
What to check before you award a turnkey order
- Who designs the lining, and for what temperature profile
- Where the equipment is fabricated, and who inspects it
- Whether erection and refractory work are done by the supplier's own crews
- Who does the dry-out and commissioning, and which handover documents you receive
- Warranty terms for both the equipment and the lining